Aveon Offshore

ADDAX PETROLEUM PRESSURE VESSEL

ADDAX PETROLEUM PRESSURE VESSEL

PROJECT INFORMATION

Client:

Chevron Nigeria Limited

Schedule

October 2003 to January 2005

Production man hours:

180,000

Painting

6000 Square Meters

ADDAX PETROLEUM PRESSURE VESSEL

PROJECT INFORMATION

Client:

Chevron Nigeria Limited

Schedule:

October 2003 to January 2005

Production man hours:

180,000

Painting

6000 Square Meters

Lorem IpsumĀ is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type speci men book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing.

Lorem IpsumĀ is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley.

SCOPE OF WORK

Wellhead Deck (200 tons), Riser Deck (100 tons), (1) 3 legs jacket (100 tons), (1) 4 legs jacket (100 tons), Helideck (50 tons), Bridges (50 tons), Pliers (300 tons). Total 900 tons

Upending

Jacket Load Out

Helidesk Load Out

Upending

Jacket Load Out

Helidesk Load Out